Grapples and Tangelos: Why it’s Impossible to Compare Fairly

Started by sfoskett · 7 months ago

I get the same questions all the time: Should I buy X or Y? Is Z better than Q? But as much as it sounds like a cop-out, I always answer, “well, this sounds like a cop-out, but that depends on what you’re doing with it…”
Now EMCR ... Continue reading »

2 comments

  • Hi Steve -- I thought your questions were good, so I replayed them as a comment on my blog.

    Yes, this may seem a bit foolhardy, but we are convinced that there are fundamental differences in approaches that matter in terms of overall efficiency.

    Here's what I wrote on my blog:

    -----

    You write: Does EMC really support using the five vault reserve disks on a CLARiiON to hold production data?

    Answer: yes, we do.

    You write: Would EMC really suggest 8+1 RAID 5 for a production Exchange and SQL Server environment?

    Answer: yes, we do -- and we've got the test data to back it up. The performance and availability characterizations are publicly available, I think. I'd be glad to send them to you to review, if you'd like.

    You write: Is one hot spare per two DAEs (30 drives) really sufficient for a whole pile of 9-disk RAID 5 sets that are maxed-out with production data? I’d feel much more comfortable with a few more spares with such large RAID 5 sets.

    Answer: the configuration has multiple global proactive hot spares, so it's not useful to think of it that way. Also, the proactive sparing algorithm means we usually get to a drive before it totally fails. CLARiiON engineering considers this recommendation "conservative". We stand by it.

    However, please add as many drives as makes you feel comfortable. We can always make more :-)

    You write: There is no way 14+2 RAID DP is equivalent to 4+1 RAID 5, let alone 8+1. It’s in a different league of reliability.

    Answer: although we'd debate that it's far more than your choice of RAID algorithm that impacts overall availability, we just went with what each vendor recommended as best practice.

    We made our recommendation, HP made theirs, NetApp made theirs.

    You write: Yeah, NetApp’s space reserve recommendation stinks. But you probably won’t need 100% in production - the real amount is something one would work out when testing and piloting and is probably substantially less than this.

    Answer: gee, NetApp's pitch is all about simplicity. You mean I have to run a bunch of trials to get to the optimum setting? That wasn't in the marketing deck I saw! :-)

    Also, let's not forget that the penalty for getting things wrong is a catastrophic application crash, which is pretty severe ..

    The bottom line we simply went with what each vendor recommended, and was willing to support, because that's what the majority of customers will end up running, right?

    There are no value judgments here on whether the recommendations made by different vendors are "right" or "wrong". That's an entirely different discussion, isn't it?

    I know you think I'm putting my neck out there, but I think this is a good discussion to have.

    The differences in approaches are striking, wouldn't you agree?

    -- Chuck
  • There are very few similarities between the CX and EVA architecture, the only part that comes even close to being comparable is how they are physically put together, i.e dual controllers and multiple enclosures, the similarities end there. In terms of how the system is managed, and how functionality is implemented, the two are completely different animals.

    Here's some numbers for the EVA, BTW I don't work for HP but do like the EVA technology. Once you've used it's a bit like a good sat nav (EVA) after using a paper map atlas (traditional array) all your life. Initially you completely mistrust where it's taking you and try to go your own way, over time your mistakes become more appernt and you learn to trust the technology.

    Equivalent of 120x146GB = 17.5TB required total usable (inc Raid 5 + Sparing)

    Single DIsk group (all VR5 as per Chuck)
    173x146GB = 25,258GB RAW
    173x146GB = 24,666GB after Rightsizing
    173x146GB = 23,643GB after Metadata
    Set 90% occupancy alarm = 10% reserve = 21,279GB
    Add distributed sparing = 21,033GB
    Vraid 5 available = 17,527GB
    % Available = 17,527GB / 24,666GB = 71% utilization
    173 Disks = 13 Enclosures

    A more realistic config for a large Exchange environment would be.

    Two DIsk groups (all VR5 as per Chuck)
    144x146GB = 21,024GB RAW
    144x146GB = 20,531GB after Rightsizing
    144x146GB = 19,680GB after Metadata
    Set 90% occupancy alarm = 10% reserve = 17,712GB
    Add distributed sparing = 17,466GB
    Vraid 5 available = 14,555GB
    % Available = 14,555GB / 20,531GB = 70%

    Disk group 2 = 32x144GB = 4672GB RAW
    32x144GB = 4,562GB after Rightsizing
    8x144GB = 4,373GB after Metadata
    Set 90% occupancy alarm = 10% reserve = 3,936GB
    Add distributed sparing = 3,690GB
    Vraid 5 available = 3,075GB
    % Available = 3,075GB / 4,562GB = 67%

    70% + 67% = 137 / 2 Disk groups = 68.5% utilization
    144 Disks + 32 Disks = 176 = 13 Enclosures
    14,555GB + 3,075GB = 17,630GB

    Note these are real world figures without vendor spin. A key thing about the use of disk groups and vdisks is that of the 17.xTB available on each configuration, every GB displayed as usable, is absolutely usable within the disk group i.e No stranded capacity within the stripe set as is usually the case for a non virtualized array. I know from experience that with a traditional array environment, over time you tend to create pockets of stranded space all over the array with little chance of reclamation, unless your predictions and planning are spot on. With virtual pool you just take the capacity required at any point in time, you've divorced capacity from the underlying pool so when you need some more just take it. Not enough space in the pool, just add some more and draw the capcity you need. It's all on line and totally transparent to the hosts and applications. HP have had technology for 6+ years now but have failed to market the benefits to there full potential.